
Picked up some needed bits off a fellow mk1er

Had some goodies.....

Bought a clutch kit off ebay for £16 expecting a cheapo....

Did some paint correction...



Some much needed work on the brakes.
BEFORE

AFTER

Got some EBC pads in there too.
Which brings me up to now roughly. Got pretty much all the bits needed to do a manual conversion, gearbox needs cleaning, repainting, re gasketing and a checkover by the local gearbox place before fitting.





Think im going to need new starter motor and passenger drive shaft. Will find out when I get to it I suppose.
Im off again on Tuesday so the back brakes are getting serviced and new brake fluid fully flushed through the system. Thinking of fitting GTE drums as them and the pads are wider.
Hope you enjoyed the update!!!